PROJECTS
Major Experiences in Waterproofing Systems
List of Major waterproofing Experiences (Deep Excavation)
Project | Specification |
---|---|
Mahestan Commercial Complex Drainage Design & Supervision , Tehran, 2008 | Depth 24 m, above water table |
Amir Kabir Commercial Complex Drainage and Waterproofing Design & Supervision, Tehran, 2010-2011 | Depth 30 m, 8 m below water table, 6000 m2 |
Delgosha Commercial Complex Drainage and Waterproofing Design & Supervision, Tehran, 2012 | Depth 34 m, 12 m below water table, 4000 m2 |
Pesian Commercial Complex Drainage and Waterproofing Design & Execution, Tehran, 2013 | Depth 22 m, 6 m below water table, 700 m2 |
Sepah Bank Complex Waterproofing Supervision, Tehran, 2012-13 | Depth 30 m, 9 m below water table |
Firoozeh Shargh Complex Drainage and Waterproofing Design & Execution , Mashhad, 2014 (on-going) | Depth 21 m, 12000 m2 |
Negin-e Ofogh Commercial Complex Drainage Design , Tehran,2014 | Depth 43 m, 16000 m2 |
Tehran Stock Market Retaining Wall Waterproofing Execution, Tehran, 2015 (on-going) | 4000 m2 |
List of Major waterproofing Experiences (Urban Tunnels)
Project | Specification |
---|---|
Niayesh Tunnel Drainage and Waterproofing, Tehran, 2010-2012 | The whole 10-km long tunnel is drained and sealed. Drained water is evacuated through gravitational drainage galleries; no pumping system applied. |
Amir Kabir Tunnel Drainage and Waterproofing, Tehran, 2011-2013 | The whole 4-km long tunnel is drained and sealed. Drained water is evacuated by pumping." |
Hakim (Chitgar) Tunnel Drainage and Waterproofing, Tehran, 2014 (on-going) | This 2-km long tunnel is under construction and its drainage and sealing activities are on-going. |
List of Major waterproofing Experiences (Industrial Complexes)
Project | Specification |
---|---|
Al-Mahdi Aluminum Plant Drainage Design, Bander-e Abbas, 2012-13 | Dropping Water Table down to +14.5 m Elevation (Natural Ground Elevation: +20 m) |
Hormozgan Steel Plant Site and Electrical Tunnels Drainage Design, Bander-e Abbas, 2012 | Drainage of site, all workshops and electrical tunnels which their foundation depth elevations were below 5 m from natural ground |
Major Experiences in Roads & Railways
Some of the road projects P.O.R has engaged in are:
Project |
---|
Engineering studies and supervision on construction of Road in suburb of Sarab (2 sites, 18km) |
Engineering studies and supervision on construction of Road in suburb of Maku (14km) |
Engineering studies and supervision on construction of Road in suburb of Khoy (12 km) |
Engineering studies and supervision on construction of Niayesh-Sadr highway (Tehran) (10 km) |
Engineering studies for Arash-Esfandyar underpass (Tehran) (2km) |
Engineering studies for Amir Kabir traffic and quality control (Tehran) (8km) |
Engineering studies for Hakim highway traffic and quality control (Tehran) (4km) |
Marand-Bazargan Expressway Studies (270km) |
Major Experiences in Geotechnics & Engineering Geology
List of Geotechnical investigation of off shore projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Geotechnical investigation for reclamation land of Methanol Tanks in Kharg Petrochemistry | Kharg Petrochemical Company | 2006 |
2 | Geotechnical investigation of onshore and offshore for special energy industries zone in Parsian port IMIDRO | Establishment of special energy industries zone | 2009 |
3 | Geotechnical investigation of pipe line from the sea to water intake- phase 12 of South Pars zone | Consortium of IIND | 2010 |
4 | Geotechnical investigation of desalination and water intake of Bandar Abbas | Omran-Makran development company | 2010 |
5 | Geotechnical investigation of the water pipeline from the sea to water intake- Phase 19 of South Pars zone | Delta Offshore technology company | 2011 |
6 | Geotechnical investigation of Syncrolift Plan of 1th area Bandar Abbas | Marine Force of Iran Army-Passive Defense | 2012 |
7 | Geotechnical investigation of border port in Booshehr | Iranian border guard command | 2014 |
8 | Geotechnical investigation of desalination plant of Bandar Abbas | Hendeseh Pars Co. | 2014 |
List of Geotechnical investigation of dam and water pipe line projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Geotechnical investigation of Niakharm Khalkhal reservoir Dam | Ardabil Regional Water Authority | 2004 |
2 | Geotechnical investigation of reservoir Kalesar Ardabil Dam | Ardabil Regional Water Authority | 2004 |
3 | Complementary Geotechnical investigation of Barzak Kashan Dam | Qom Regional Water Authority | 2005 |
4 | Geotechnical investigation of Ghaserghand Dam-Iranshahr | Sistan and Baluchestan Rigional Water Authority | 2006 |
5 | Geotechnical investigation of irrigation and drainage networks Haraz | Mazandaran Regional Water Authority | 2007 |
6 | Geotechnical investigation of Saghave Dam | Kohgiluyeh and Boyer- Ahmad Regional Water Authority | 2009 |
7 | Geotechnical Investigation of the water transmission pipe line from Alborz Dam | Mazandaran Regional Water Authority | 2009 |
8 | Second phase of geotechnical investigation of Baroogh Dam | West Azarbayjane Regional Water Authority | 2009 |
9 | Geotechnical investigation of Khonche Kashan Dam | Esfahan Regional Water Authority | 2009 |
10 | Geotechnical investigation of Armaghankhane reservoir Dam | Zanjan Regional Water Authority | 2010 |
11 | Geotechnical investigation of Kahir reservoir Dam | Sistan and Baluchestan Regional Water Authority | 2013 |
12 | Geotechnical investigation and determine the electrical resistance of soil water transfer project in the second part of The national plan for water transmission from the Persian Gulf to south east mining industres | The company supplies and transmit of Persian Gulf water | 2014 |
List of Geotechnical investigation of buildings and industrial projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Complementary Geotechnical investigation of Emam Khomeini Mosala | Enforcement agencies and government facilities and public buildings-Ministry of Housing and Urban Development | 2005 |
2 | Geotechnical investigationand Foundation Engineering of Atisaz towers of Tabriz | Atisaz Company | 2005 |
3 | Geotechnical investigation of steel complex-Qaenat steel complex | Iran International Engineering Company (IRITEC) | 2006 |
4 | Geotechnical Investigation of Hormozgan Aluminum (Hormozal) Bandar Abbas | Renovation of mines and mining Industries development organization of Iran-Hormozgan Aluminum | 2006 |
5 | Geotechnical investigation of Sabzevar steel complex | Nasir Energy Gostar Company | 2007 |
6 | Geotechnical Investigation of LPG tanks- Kharg | Panahsaz Engineering company | 2007 |
7 | Geotechnical investigation of Chahrmahal and Bakhtiari steel complex | Foolad Paya Engineering Company | 2007 |
8 | Geotechnical investigation of shadegan steel complex | Foolad Paya Engineering Company | 2007 |
9 | Geotechnical investigation of Sirjan steel complex | Kermanian Construction and road Company | 2008 |
10 | Geotechnical Investigation of ASP in sharyar (30 Hectares area) | ASP Company | 2010 |
11 | Geotechnical investigation of Direct reduction and steel making project Baft Steel Complex | Sarallah Institute affiliated to Khatam al-Anbiya | 2009 |
12 | Geotechnical Investigation of condensate and pentane tanks- Kharg | Engineering company and panah saze of Iran | 2010 |
13 | Geotechnical investigation of Imam Reza town of Tehran | Omran Hadi Company | 2011 |
14 | Geotechnical investigation of Sangan steel complex | East Kaveh Steel Company | 2011 |
15 | Geotechnical investigation of South Kaveh steel complex | South Kaveh Steel Company | 2011 |
16 | Geotechnical Investigation And Foundation Engineering of Cheshmeh Noor Iran Project | Ministry of Science-Research and Technology-School of Cognitive Sciences | 2011 |
17 | Geotechnical investigation and Seismic studies of Commercial and Residential Yas Complex | Mr.Khalili | 2012 |
18 | Geotechnical investigation of Hezaro Yek Shahr Project | Sarmayegozari Ezam Company | 2012 |
19 | Geotechnical investigation of Sechahoon Pelletizing Project | Nasir Energy Gostar Company | 2012 |
20 | Complementary Geotechnical investigation of Residential Towers of Sarina Land Kish | Mass Construction of Sarina Land Company | 2013 |
21 | Geotechnical Investigation of Anode Making factory Aluminum Complex in Iran | Iran Aluminum Company | 2014 |
List of Geotechnical investigation of road and railway projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Geotechnical InvestigationAnd Foundation Engineering of Bypass technical building engineering of Northwestern and northeastern MiyanDoab | Ministry of Transportation – Construction and development of transportation infrastructures company | 2007 |
2 | Geotechnical Investigation of Marand-Ayu Oghli Road and technical buildings | Ministry of Transportation -Construction and development of transportation infrastructures company | 2008 |
3 | Soil Mechanics and Geotechnical testing of Sarab-Nir technical buildings and landslide of 32th km | Ministry of Transportation – Construction and development of transportation infrastructures company | 2012 |
4 | Geotechnical Investigation of retrofitting of Garmsar- Gorgan railway bridges | The Railways of Islamic Republic of Iran | 2014 |
5 | Geotechnical Investigation of retrofitting of first piece (Jannat Abad Gharetapeh) Bafq-Bandar Abbas railway | The Railways of Islamic Republic of Iran | 2014 |
6 | Geotechnical Investigation and Foundation Engineering of Mashhad railway station development | The Railways of Islamic Republic of Iran | 2015 |
List of Geotechnical investigation of tunnel and metro projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Geotechnical Investigation And Engineering Services of second line of Tabriz urban railway | Khatam al Anbia construction compasny and Imen Sazan Institute of Engineers | 2006 |
2 | Geotechnical Investigation of Niyayesh tunnel | Civil and Engineering Organization of Tehran | 2007 |
3 | Geotechnical Investigation of H7-V7-K7-M7-I7 stations and North parking of 7th line of Tehran Metro | Sepasad Engineering Company (Tehran Metro) | 2008 |
4 | Geotechnical Investigation of Amir kabir tunnel | Civil and Engineering Organization of Tehran | 2011 |
5 | Geotechnical Investigation of Arash- Esfandiyar tunnel | Civil and Engineering Organization of Tehran | 2013 |
List of Geotechnical investigation of oil and gas projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Geotechnical investigation of phase 1 of Assaluyeh petrochemical complex | Petrochemical industrial development Co. | 2002-16 |
2 | Geotechnical investigation and design of dynamic compaction of Assaluyeh petrochemical lands | Petrochemical industrial development Co. | 2002 |
3 | Geotechnical investigation And Foundation Engineering of NGL-Kharg Iland | Iran Engineering International Company | 2006 |
4 | Geotechnical investigation of producing the high density polyethylene of Dehdasht | Dehdasht Petrochemical Company | 2006 |
5 | Geotechnical Investigation of Phase 12 gas refinery of south Pars zone | Consortium of Cassion Saze- Dailam and Tose Shabakehaye Sanati Companies | 2009 |
6 | Geotechnical investigation and settlement remediation of Mahshahr petrochemical Special Economic zone | Petrochemical special economic Zone | 2011 |
7 | Geotechnical investigation of oil terminal in the Persian Gulf zone- shahid Rajai Iland | Doostar Zamin Engineering and Energy karaneh Development companies | 2013 |
8 | Geotechnical investigation of Kian Petrochemical complex | Sazepardazi Iran consulting Engineering company | 2014 |
List of Geotechnical investigation ground improvements projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Geotechnical investigation of Asalluyeh Dynamic Compaction Soil Improvement Project | Petrochemical industrial development Co. | 2000 |
2 | Geotechnical investigation of Dynamic compaction of shipyard Persian Gulf | Azar simab company (shipyards Persian Gulf) | 2002 |
3 | Dynamic compaction of improvement and reclamation lands in south pars petrochemical zone | Sazepardazi Iran consulting Engineering company | 2003 |
4 | Geotechnical investigation of soil improvement with lime melting and casting of Hormozgan Steel Complex | Construction and installation of Industries and Mines Pars (Pamykv) | 2006 |
5 | Soil improvement in phase 12 South Pars zone | Consortium of Cassion Saze- Dailam and Tose Shabakehaye Sanati Companies | 2009 |
6 | Geotechnical investigation and reclamation of Sari Garbage Burning Power Plant Project | Sari municipality | 2009 |
7 | Soil improvement and preparing the ground for a comprehensive Siraf Refineries | Siraf Refineries Infrastructure Company | 2014 |
List of Geology studies and seismic hazard analysis for projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Landslide stabilization at the petrol station Taleghan zone | Department of Natural resources and Watershed Management in Tehran | 2007 |
2 | Completion of Seismic Geotechnical Investigation of Imam Khomeini Feast | Iran Shahr Civil Company | 2008 |
3 | Seismicity investigation- Seismic risk analysis and preparation of residential complex of Iran Oil Tanker National Company | Iran Oil Tanker National Company | 2008 |
4 | Seismicity investigation-Seismic risk analysis and preparation of 40 floors towers | Atisaz company | 2008 |
5 | Seismicity investigation-Seismic risk analysis and preparation a response spectrum of hotel prestyzhland | Perstyzhland iran company | 2010 |
6 | Seismicity investigation- Seismic risk analysis and Preparation of Niyayesh tunnel | Tehran municipality | 2011 |
7 | Landslide refinery Alborz | Mazandaran Regional Water Company | 2011 |
8 | Seismicity investigation-Seismic risk analysis and preparation a response spectrum of Petrochemistry Hormoz | Persian Gulf petrochemical industries company | 2014 |
List of Pile loading test and PIT
Project | Specification | Client | Year |
---|---|---|---|
1 | Pile Load Tests in Shadegan steel Complex | Foolad Paya Company | 2006 |
2 | Pile Load Tests in Ghaenat steel Complex | Iranian Offshore Engineering and Construction Company | 2007 |
3 | Pile Load Tests in Miyaneh steel Complex | Khtam al Anbia construction and kani Mes company | 2007 |
4 | Pile Load Tests in steel South Kaveh Steel Complex | ITRITEC Company | 2009 |
5 | Pile Load Tests of phase 13 of Assaluyeh | Abadrahan pars Company | 2011 |
6 | Pile Integrity Tests in South Kaveh Steel Complex | South Kaveh Steel Company | 2011 |
7 | Pile Load Tests in Babolsar residential tower | Arsa International Construction Company | 2012 |
List of Geotechnical investigation of buildings and industrial projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Establishment of local laboratories of dynamic compaction lands in Assalluyeh petrochemical projects | Petrochemical industrial development Co. | 2003 |
2 | Establishment of local laboratories to quality control of concrete of NGL Kharg project | Iran Engineering International Company | 2006 |
3 | Establishment of local laboratories to quality control of soil and concrete of Ghaenat steel project | Iranian Offshore Engineering and Construction Company | 2006 |
4 | Establishment of local laboratories to quality control of concrete of Emam Khomeini Mosala | Enforcement agencies and government facilities and public buildings- Ministry of Housing and Urban Development | 2006 |
5 | Establishment of local laboratories to quality control of concrete of Shadegan steel project | Foolad Paya Company | 2008 |
6 | Establishment of local laboratories to quality control of concrete of Niyayesh tunnel Tehran | Civil and Engineering Organization of Tehran | 2008-10 |
7 | Establishment of geotechnical laboratories and strength of materials of combined cycle power generation BOO Yazd and Yazd Farab | Construction and Development Company Mapna combined cycle power generation (of 2) | 2010 |
8 | Establishment of local laboratories of South Pars phase 12 EPC3 zone | Dor Riz Company | 2010 |
9 | Establishment of local laboratories to control quality Soil and concrete of project Gordyan Dam | East Azerbaijan Regional Water Authority | 2010-11 |
10 | Establishment of local laboratories to control quality Soil and concrete of Kish South Kaveh Steel | South Kaveh Steel Company | 2011 |
11 | Establishment of local laboratories to quality control of Soil and concrete of Kahir Dam | Sistan and Baluchestan Regional Water Authority | 2010-12 |
12 | Establishment of local laboratories to quality control of Maadkoush Pelletizing Project | PCK Company | 2012-13 |
13 | Establishment of local laboratories to quality control of Soil and concrete of Jahan Ara Arvand steel | Jahan Ara Arvand steel Complex | 2014 |
14 | Establishment of laboratories to quality control of concrete of Arash- Esfandiyar tunnel | Khatam al Anbia construction company- Ghorb Nooh – Hara Institute | 2015 |
15 | performing laboratory Services to quality control of Soil and concrete of Hajilar Chay Dam | East Azerbaijan Regional Water Authority | 2009-15 |
Major Experiences in Tunnels & Underground Spaces
List Of Tunnel Projects
Project | Specification |
---|---|
Niayesh Tunnel | Tehran, 2010-2012 |
Amir Kabir Tunnel | Tehran, 2011-2013 |
Hakim (Chitgar) Tunnel | Tehran, 2014 (on-going) |
Vali-e-Asr Junction Underpass | Tehran, 2014 |
List Of Deep Excavation Projects
Project | Specification |
---|---|
Baran Commercial-Office Complex | Tehran, 2008 |
Narges Commercial-Office Complex | Tehran, 2008 |
Eram Mahestan Commercial Complex | Tehran, 2008 |
Yas Commercial Complex | Tehran, 2009 |
Major Experiences in Structure & Architecture
The most Important Projects in Structures / Architecture Section Include:
Project |
---|
Structural designing, construction and supervision construction of Export & Development Bank Sites in Isfahan, Arak , Sari and Zanjan |
Design and supervision on construction of residential buildings (1'040 unit) |
Design of Danon-Sahar plant – Ghazvin |
Design and supervision on construction of Jasor Factory in Tabriz Design of residential building in Tabriz Azad University |
Supervision on construction of 4 commercial and residential towers of Baran Complex in Tehran |
Design and supervision services for Marzdaran Hotel in Tehran |
Projects completed by Retrofitting section are:
Project |
---|
Services for retrofitting of 13 hospital buildings in Tehran |
Retrofitting tests in Zarand Railway Station in Kerman & Kerman Schools & Central Railway Station in Tehran and in some 7 bridges in Tehran. |
Major Experiences in Water Management
List Of Dam Engineering Projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Phases I & II studies and supervision on construction of Joghan Dam | East Azarbayejan Regional Water Authority | 2001-2002 |
2 | Phases I & II studies and supervision on construction of Aghbolaq Dam | East Azarbayejan Regional Water Authority | 2001-2002 |
3 | Phases I & II studies – Anbaran Dam | Ardabil Regional Water Authority | 2001-2006 |
4 | Phase I studies – Khajeh Yar Dam in Khaf | Khorasan Razavi regional water authority | 2006 |
5 | Phase I studies – Arabshah Garoos Dam in Takab | West Azarbayejan Regional Water Authority | 2009 |
6 | Phases I & II studies- Ghaleh Ganj in Kerman | Jiroft and Kahnuj agricultural Jahad | 2008 |
7 | Phases I & II studies- Zavieh Kord Dam | Ardabil Regional Water Authority | 2002-2004 |
8 | Feasibility studies on construction of pump-storage dams in Hormozgan and Kerman Provinces in Iran | Sazeh Pardazi Iran Consulting Eng. Co. and Iran Water and Power Resources Development Co | 2006 |
List Of Irrigation And Drainage Projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Detailed Design and Supervision on Construction Flood Detention Storage for South Hakim Highway in Tehran | Technical and Civil Deputy Municipality of Tehran,Hara Institute of proximity of Noah's Ark | 2013 |
2 | Phases I & II studies and supervision on construction of irrigation and drainage Aghbolagh | East Azarbayejan Regional Water Authority | 2003-2011 |
3 | Phases I & II studies and supervision on construction of irrigation and drainage Dost-Ali | Agriculture Jihad Organization of west Azerbaijan province | 2012 |
4 | Phase I studies for irrigation and drainage network Zavieh Kord-Anbaran & Ivriq | Ardabil Regional Water Authority | 2006 |
5 | Phase I studies for irrigation and drainage network Joghan | East Azarbayejan Regional Water Authority | 2002 |
6 | Collection and drainage of runoff in Sufian Cement Plant | Soufian cement factories | 2006 |
List Of River Engineering Projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Zanjanrood River restoration within Zanjan City limits | Zanjan Regional Water Authority | 2011 |
2 | River materials potential estimation study in Zanjanrood River and its upstream tributaries | Zanjan Regional Water Authority | 2008 |
3 | Phases I feasibility study for Zanjanrood River upstream tributaries management & training | Zanjan Regional Water Authority | 2010 |
4 | Complementary studies for delineation of right-of-way for Zanjanrood River & Hassan-abdal tributary | Zanjan Regional Water Authority | 2012 |
5 | Reconnaissance phase in comprehensive study for optimum use of land & water resource along Symereh & Jazman River in Halilan plain in Ilam | Ilam Regional Water Authority | 2001 |
6 | Flood control studies in Soufian cement factories basins | Soufian cement factories | 2006 |
7 | Flood control & management along Tabriz Metro Line II | Iman Sazan Co. | 2007 |
8 | Studies for delineation of Zohreh & Kheirabad River right-of-way in Hendijan | ||
List Of Agriculture Projects
Project | Specification | Client | Year |
---|---|---|---|
1 | Study on the Development of Orchards in Sloping Lands in Maku Region | Agriculture Jihad Organization of west Azerbaijan province | 2012 |
2 | Social and Water User Group Studies of Aghbolagh Irrigation Network | East Azarbayejan Regional Water Authority | 2006 |
3 | Soil Assessment Studies of Doostali Irrigation Network | Agriculture Jihad Organization of west Azerbaijan province | 2011 |
4 | Study of Aquaculture Potentials in East Azerbaijan Province | East Azarbayejan Regional Water Authority | 2005 |
Copyrights © 2015 Pazhoohesh Omran Rahvar Engineering Company